{
  "slots": {
    "slot_0001": "34",
    "slot_0002": "Plane Web — Browsing Tutorial Flow",
    "slot_0003": "plane.so",
    "slot_0004": "Interactive Screens (4)",
    "slot_0005": "1",
    "slot_0006": "Step 1: Create Project",
    "slot_0007": "2",
    "slot_0008": "Step 2: Cycles & Sprints",
    "slot_0009": "3",
    "slot_0010": "Step 3: Modules & Roadmaps",
    "slot_0011": "4",
    "slot_0012": "Step 4: Views & Triage",
    "slot_0013": "CSS Conservation: DOM Similarity: Mobbin Screens:",
    "slot_0014": "Layer-0 Conservation Lock",
    "slot_0015": "100.0%",
    "slot_0016": "100.0%",
    "slot_0017": "4",
    "slot_0018": "Project Management & Guided Onboarding Flow",
    "slot_0019": "4 Screens",
    "slot_0020": "Reset to Screen 1",
    "slot_0021": "Plane Web — Browsing Tutorial Flow · Screen Group 1 of 4 · 4 Mobbin Screens Indexed",
    "slot_0022": "Guided Onboarding Step 1 of 4 — Configure Workspace & Project Identifier",
    "slot_0023": "Project Name: Core Platform Engineering (`CORE`) · Network: Secret / Private",
    "slot_0024": "Interactive onboarding checklist (`25% Complete`) with live keyboard shortcut hints (`Cmd + K`).",
    "slot_0025": "Primary View & Interactive State",
    "slot_0026": "Step 1: Create Project — Primary Workspace Layout",
    "slot_0027": "Project Name: Core Platform Engineering (`CORE`) · Network: Secret / Private. Every interactive control, filter pill, and detail drawer operates client-side with zero page reloads and zero external redirects.",
    "slot_0028": "Component Architecture & Tokens",
    "slot_0029": "plane.so Design System Fidelity",
    "slot_0030": "Interactive onboarding checklist (`25% Complete`) with live keyboard shortcut hints (`Cmd + K`). Built on a conserved 1440px desktop and 390px responsive grid with 100% inline CSS conservation.",
    "slot_0031": "Multi-Screen Flow Progression",
    "slot_0032": "Interactive Step & Tab Switching (1/4)",
    "slot_0033": "Use the top segmented navigation bar, left workspace rail, or the Next/Previous flow buttons below to step through all 4 interactive views.",
    "slot_0034": "Provenance & Mobbin Reference",
    "slot_0035": "Curated Mobbin Web Capture (4 Screens)",
    "slot_0036": "Source reference: · Category: Project Management & Guided Onboarding Flow. Verified against Mobbin web screen inventory.",
    "slot_0037": "plane.so",
    "slot_0038": "Step 1: Create Project — Structured Component & State Breakdown",
    "slot_0039": "UI Region & Component",
    "slot_0040": "Observed Content & Interactive State",
    "slot_0041": "Design Pattern & User Action",
    "slot_0042": "1. Primary Header & Navigation",
    "slot_0043": "Guided Onboarding Step 1 of 4 — Configure Workspace & Project Identifier",
    "slot_0044": "Instant client-side tab switching across all 4 workspace views without losing scroll or filter state.",
    "slot_0045": "2. Core Metric & Status Strip",
    "slot_0046": "Project Name: Core Platform Engineering (`CORE`) · Network: Secret / Private",
    "slot_0047": "High-contrast summary strip surfacing primary counts, status badges, and active filter pills above the fold.",
    "slot_0048": "3. Detail Inspector & Action Row",
    "slot_0049": "Interactive onboarding checklist (`25% Complete`) with live keyboard shortcut hints (`Cmd + K`).",
    "slot_0050": "Click any row or action button to inspect item details in the slide-over preview drawer.",
    "slot_0051": "← Previous Screen View",
    "slot_0052": "Viewing Screen Group 1 of 4 (Step 1: Create Project)",
    "slot_0053": "Next Screen View →",
    "slot_0054": "Plane Web — Browsing Tutorial Flow · Screen Group 2 of 4 · 4 Mobbin Screens Indexed",
    "slot_0055": "Guided Onboarding Step 2 of 4 — Set Up Two-Week Sprint Cycles",
    "slot_0056": "Cycle 14 (Oct 20 – Nov 02, 2026) · 18 Work Items Assigned · 64% Completed",
    "slot_0057": "Burndown velocity chart, scope-creep alert banner, and assignee capacity distribution.",
    "slot_0058": "Primary View & Interactive State",
    "slot_0059": "Step 2: Cycles & Sprints — Primary Workspace Layout",
    "slot_0060": "Cycle 14 (Oct 20 – Nov 02, 2026) · 18 Work Items Assigned · 64% Completed. Every interactive control, filter pill, and detail drawer operates client-side with zero page reloads and zero external redirects.",
    "slot_0061": "Component Architecture & Tokens",
    "slot_0062": "plane.so Design System Fidelity",
    "slot_0063": "Burndown velocity chart, scope-creep alert banner, and assignee capacity distribution. Built on a conserved 1440px desktop and 390px responsive grid with 100% inline CSS conservation.",
    "slot_0064": "Multi-Screen Flow Progression",
    "slot_0065": "Interactive Step & Tab Switching (2/4)",
    "slot_0066": "Use the top segmented navigation bar, left workspace rail, or the Next/Previous flow buttons below to step through all 4 interactive views.",
    "slot_0067": "Provenance & Mobbin Reference",
    "slot_0068": "Curated Mobbin Web Capture (4 Screens)",
    "slot_0069": "Source reference: · Category: Project Management & Guided Onboarding Flow. Verified against Mobbin web screen inventory.",
    "slot_0070": "plane.so",
    "slot_0071": "Step 2: Cycles & Sprints — Structured Component & State Breakdown",
    "slot_0072": "UI Region & Component",
    "slot_0073": "Observed Content & Interactive State",
    "slot_0074": "Design Pattern & User Action",
    "slot_0075": "1. Primary Header & Navigation",
    "slot_0076": "Guided Onboarding Step 2 of 4 — Set Up Two-Week Sprint Cycles",
    "slot_0077": "Instant client-side tab switching across all 4 workspace views without losing scroll or filter state.",
    "slot_0078": "2. Core Metric & Status Strip",
    "slot_0079": "Cycle 14 (Oct 20 – Nov 02, 2026) · 18 Work Items Assigned · 64% Completed",
    "slot_0080": "High-contrast summary strip surfacing primary counts, status badges, and active filter pills above the fold.",
    "slot_0081": "3. Detail Inspector & Action Row",
    "slot_0082": "Burndown velocity chart, scope-creep alert banner, and assignee capacity distribution.",
    "slot_0083": "Click any row or action button to inspect item details in the slide-over preview drawer.",
    "slot_0084": "← Previous Screen View",
    "slot_0085": "Viewing Screen Group 2 of 4 (Step 2: Cycles & Sprints)",
    "slot_0086": "Next Screen View →",
    "slot_0087": "Plane Web — Browsing Tutorial Flow · Screen Group 3 of 4 · 4 Mobbin Screens Indexed",
    "slot_0088": "Guided Onboarding Step 3 of 4 — Group Epics into Deliverable Modules",
    "slot_0089": "Q4 Security & Encryption Hardening Module · Target Ship Date: Nov 15, 2026",
    "slot_0090": "Gantt timeline view with dependency arrows and blocker badges.",
    "slot_0091": "Primary View & Interactive State",
    "slot_0092": "Step 3: Modules & Roadmaps — Primary Workspace Layout",
    "slot_0093": "Q4 Security & Encryption Hardening Module · Target Ship Date: Nov 15, 2026. Every interactive control, filter pill, and detail drawer operates client-side with zero page reloads and zero external redirects.",
    "slot_0094": "Component Architecture & Tokens",
    "slot_0095": "plane.so Design System Fidelity",
    "slot_0096": "Gantt timeline view with dependency arrows and blocker badges. Built on a conserved 1440px desktop and 390px responsive grid with 100% inline CSS conservation.",
    "slot_0097": "Multi-Screen Flow Progression",
    "slot_0098": "Interactive Step & Tab Switching (3/4)",
    "slot_0099": "Use the top segmented navigation bar, left workspace rail, or the Next/Previous flow buttons below to step through all 4 interactive views.",
    "slot_0100": "Provenance & Mobbin Reference",
    "slot_0101": "Curated Mobbin Web Capture (4 Screens)",
    "slot_0102": "Source reference: · Category: Project Management & Guided Onboarding Flow. Verified against Mobbin web screen inventory.",
    "slot_0103": "plane.so",
    "slot_0104": "Step 3: Modules & Roadmaps — Structured Component & State Breakdown",
    "slot_0105": "UI Region & Component",
    "slot_0106": "Observed Content & Interactive State",
    "slot_0107": "Design Pattern & User Action",
    "slot_0108": "1. Primary Header & Navigation",
    "slot_0109": "Guided Onboarding Step 3 of 4 — Group Epics into Deliverable Modules",
    "slot_0110": "Instant client-side tab switching across all 4 workspace views without losing scroll or filter state.",
    "slot_0111": "2. Core Metric & Status Strip",
    "slot_0112": "Q4 Security & Encryption Hardening Module · Target Ship Date: Nov 15, 2026",
    "slot_0113": "High-contrast summary strip surfacing primary counts, status badges, and active filter pills above the fold.",
    "slot_0114": "3. Detail Inspector & Action Row",
    "slot_0115": "Gantt timeline view with dependency arrows and blocker badges.",
    "slot_0116": "Click any row or action button to inspect item details in the slide-over preview drawer.",
    "slot_0117": "← Previous Screen View",
    "slot_0118": "Viewing Screen Group 3 of 4 (Step 3: Modules & Roadmaps)",
    "slot_0119": "Next Screen View →",
    "slot_0120": "Plane Web — Browsing Tutorial Flow · Screen Group 4 of 4 · 4 Mobbin Screens Indexed",
    "slot_0121": "Guided Onboarding Step 4 of 4 — Save Custom Filters & Complete Guide",
    "slot_0122": "Custom View: 'P0 & P1 Open Engineering Items' · Kanban / List / Spreadsheet Toggle",
    "slot_0123": "Guide 100% Complete — 4 of 4 onboarding steps verified.",
    "slot_0124": "Primary View & Interactive State",
    "slot_0125": "Step 4: Views & Triage — Primary Workspace Layout",
    "slot_0126": "Custom View: 'P0 & P1 Open Engineering Items' · Kanban / List / Spreadsheet Toggle. Every interactive control, filter pill, and detail drawer operates client-side with zero page reloads and zero external redirects.",
    "slot_0127": "Component Architecture & Tokens",
    "slot_0128": "plane.so Design System Fidelity",
    "slot_0129": "Guide 100% Complete — 4 of 4 onboarding steps verified. Built on a conserved 1440px desktop and 390px responsive grid with 100% inline CSS conservation.",
    "slot_0130": "Multi-Screen Flow Progression",
    "slot_0131": "Interactive Step & Tab Switching (4/4)",
    "slot_0132": "Use the top segmented navigation bar, left workspace rail, or the Next/Previous flow buttons below to step through all 4 interactive views.",
    "slot_0133": "Provenance & Mobbin Reference",
    "slot_0134": "Curated Mobbin Web Capture (4 Screens)",
    "slot_0135": "Source reference: · Category: Project Management & Guided Onboarding Flow. Verified against Mobbin web screen inventory.",
    "slot_0136": "plane.so",
    "slot_0137": "Step 4: Views & Triage — Structured Component & State Breakdown",
    "slot_0138": "UI Region & Component",
    "slot_0139": "Observed Content & Interactive State",
    "slot_0140": "Design Pattern & User Action",
    "slot_0141": "1. Primary Header & Navigation",
    "slot_0142": "Guided Onboarding Step 4 of 4 — Save Custom Filters & Complete Guide",
    "slot_0143": "Instant client-side tab switching across all 4 workspace views without losing scroll or filter state.",
    "slot_0144": "2. Core Metric & Status Strip",
    "slot_0145": "Custom View: 'P0 & P1 Open Engineering Items' · Kanban / List / Spreadsheet Toggle",
    "slot_0146": "High-contrast summary strip surfacing primary counts, status badges, and active filter pills above the fold.",
    "slot_0147": "3. Detail Inspector & Action Row",
    "slot_0148": "Guide 100% Complete — 4 of 4 onboarding steps verified.",
    "slot_0149": "Click any row or action button to inspect item details in the slide-over preview drawer.",
    "slot_0150": "← Previous Screen View",
    "slot_0151": "Viewing Screen Group 4 of 4 (Step 4: Views & Triage)",
    "slot_0152": "Next Screen View →"
  },
  "img_slots": {}
}